App

Key hydropower complex in south China put into full-scale operation
Updated: September 4, 2023 10:36 CGTN

All power generation units of the Dateng Gorge Water Conservancy Project have now been put into full operation as of September 2. Located at the outlet of the Dateng Gorge on the mainstream of the Qianjiang River of the Pearl River Basin in Guiping City in the Guangxi Zhuang Autonomous Region, the project is designed for flood control, navigation, power generation, water supply and irrigation. After the completion of the entire project, the navigation capacity of the Qianjiang River will be enhanced from 300 to 3,000 tonnes. It also shortens the response time for emergency water replenishment from 10 days to three days, effectively ensuring the safety of the water supply in the Guangdong-Hong Kong-Macao Greater Bay Area.

Copyright© www.gov.cn | About us | Contact us

Website Identification Code bm01000001 Registration Number: 05070218

All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to www.gov.cn.

Without written authorization from www.gov.cn, such content shall not be republished or used in any form.

Mobile

Desktop

Copyright© www.gov.cn | Contact us

Website Identification Code bm01000001

Registration Number: 05070218