On Saturday, after eight hours of continuous operation, China's largest double-main truss bridge deck crane with a lifting capacity of 2,000 tonnes completed its load test.
The test was carried out on the Changtai Yangtze River Bridge, an important project of the comprehensive three-dimensional transportation corridor of the Yangtze River Economic Belt.
The main channel of the bridge is expected to be completed by May 2024.