App

Section of Jiulongjiang Grand Bridge rotates to designated position
Updated: January 21, 2021 17:13 Xinhua
Aerial photo taken on Jan 21, 2021 shows a section of the Jiulongjiang Grand Bridge, one part of the Fuzhou-Xiamen Railway which is under construction, completing rotation to its designated position in East China's Fujian province. This section of the Jiulongjiang Grand Bridge, with a length of 160 meters and a weight of over 14,000 tons, successfully rotated to the designated position on Jan 21. [Photo/Xinhua]
Aerial photo taken on Jan 21, 2021 shows a section of the Jiulongjiang Grand Bridge, one part of the Fuzhou-Xiamen Railway which is under construction, rotating to its designated position in East China's Fujian province. [Photo/Xinhua]
Aerial photo taken on Jan 21, 2021 shows a section of the Jiulongjiang Grand Bridge, one part of the Fuzhou-Xiamen Railway which is under construction, rotating to its designated position in East China's Fujian province. [Photo/Xinhua]
Aerial photo taken on Jan 21, 2021 shows a section of the Jiulongjiang Grand Bridge, one part of the Fuzhou-Xiamen Railway which is under construction, rotating to its designated position in East China's Fujian province. [Photo/Xinhua]
Aerial photo taken on Jan 21, 2021 shows a part of the Jiulongjiang Grand Bridge of the newly-built Fuzhou-Xiamen Railway during its rotation to designated position in East China's Fujian province. [Photo/Xinhua]

Copyright© www.gov.cn | About us | Contact us

Website Identification Code bm01000001 Registration Number: 05070218

All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to www.gov.cn.

Without written authorization from www.gov.cn, such content shall not be republished or used in any form.

Mobile

Desktop

Copyright© www.gov.cn | Contact us

Website Identification Code bm01000001

Registration Number: 05070218