App

Guiyang Longdongpu International Airport under construction
Updated: March 22, 2021 10:52 english.www.gov.cn/Xinhua
The construction site of Terminal 3 of Guiyang Longdongpu International Airport, March 19, 2021. The interior of the terminal building was stepped up as total investment for the expansion project reached 20 billion yuan ($3.07 billion). The construction is scheduled to be finished this year. [Photo/Xinhua]
The China Construction Third Engineering Bureau Group is part of the Terminal 3 project at Guiyang Longdongpu International Airport, March 19, 2021. [Photo/Xinhua]
A worker from China Construction Third Engineering Bureau Group carries construction materials at Guiyang Longdongpu International Airport, March 19, 2021. [Photo/Xinhua]
A worker from China Construction Third Engineering Bureau Group sets up a suspended ceiling at Terminal 3 of Guiyang Longdongpu International Airport, March 19, 2021. [Photo/Xinhua]
A worker from China Construction Third Engineering Bureau Group at Terminal 3 of Guiyang Longdongpu International Airport. [Photo/Xinhua]

Copyright© www.gov.cn | About us | Contact us

Website Identification Code bm01000001 Registration Number: 05070218

All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to www.gov.cn.

Without written authorization from www.gov.cn, such content shall not be republished or used in any form.

Mobile

Desktop

Copyright© www.gov.cn | Contact us

Website Identification Code bm01000001

Registration Number: 05070218