App

Track laying of Guiyang-Nanning high-speed railway begins in Guangxi
Updated: August 16, 2022 21:37 Xinhua
Photo taken on Aug 16, 2022 shows the track laying work on the Longjiang River grand bridge of the Guiyang-Nanning high-speed railway (Guangxi section) in Hechi, South China's Guangxi Zhuang autonomous region. The railway track laying work of the Guiyang-Nanning high-speed railway, designed with a speed of 350 km per hour, began in Hechi of Guangxi on Aug 16. [Photo/Xinhua]
Photo taken on Aug 16, 2022 shows the track laying work on the Longjiang River grand bridge of the Guiyang-Nanning high-speed railway (Guangxi section) in Hechi, South China's Guangxi Zhuang autonomous region. [Photo/Xinhua]
Aerial photo taken on Aug 16, 2022 shows the Longjiang River grand bridge of the Guiyang-Nanning high-speed railway (Guangxi section) in Hechi, South China's Guangxi Zhuang autonomous region. [Photo/Xinhua]
Aerial photo taken on Aug 16, 2022 shows the Longjiang River grand bridge of the Guiyang-Nanning high-speed railway (Guangxi section) in Hechi, South China's Guangxi Zhuang autonomous region. [Photo/Xinhua]

Copyright© www.gov.cn | About us | Contact us

Website Identification Code bm01000001 Registration Number: 05070218

All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to www.gov.cn.

Without written authorization from www.gov.cn, such content shall not be republished or used in any form.

Mobile

Desktop

Copyright© www.gov.cn | Contact us

Website Identification Code bm01000001

Registration Number: 05070218