All generating units on left bank of Baihetan go into operation
Updated: September 23, 2022 14:35CGTN
The last power-generating unit of the Baihetan Hydropower Station in Southwest China passed its 72-hour trial run and started operation officially on Sept 22, signaling full operation of the eight units on the left bank of the project.