A highway overpass that spans over busy railway lines was formed after six bridge sections were successfully rotated into position.
The last rotating section – a 13,000-ton box girder of the fly-over bridge – was made to turn 60 degrees clockwise and swiveled into its designated position 90 minutes later to form a complete overpass on Aug 23 in Wuhan city, Central China's Hubei province.