App

Wang'an tunnel of Nanning-Yulin high-speed railway drilled through
Updated: December 14, 2021 09:50 Xinhua
A worker carries out welding operation at the construction site of the Wang'an Tunnel of the high-speed railway linking Nanning and Yulin of South China's Guangxi Zhuang autonomous region, Dec 13, 2021. The Wang'an tunnel, a key project for the Nanning-Yulin high-speed railway, was drilled through on Dec 13. With a designed speed of 350 km per hour, the Nanning-Yulin high-speed railway is a crucial part of the high-speed railway linking Nanning of Guangxi Zhuang autonomous region and Shenzhen of Guangdong province. [Photo/Xinhua]
Aerial photo taken on Dec 13, 2021 shows the construction site of the Wang'an Tunnel of the high-speed railway linking Nanning and Yulin of South China's Guangxi Zhuang autonomous region. [Photo/Xinhua]
An excavator is seen working at the construction site of the Wang'an Tunnel of the high-speed railway linking Nanning and Yulin of South China's Guangxi Zhuang autonomous region, Dec 13, 2021. [Photo/Xinhua]
Aerial photo taken on Dec 13, 2021 shows the construction site of the Wang'an Tunnel of the high-speed railway linking Nanning and Yulin of South China's Guangxi Zhuang autonomous region. [Photo/Xinhua]

Copyright© www.gov.cn | About us | Contact us

Website Identification Code bm01000001 Registration Number: 05070218

All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to www.gov.cn.

Without written authorization from www.gov.cn, such content shall not be republished or used in any form.

Mobile

Desktop

Copyright© www.gov.cn | Contact us

Website Identification Code bm01000001

Registration Number: 05070218